Skip to content

California solar software · Zoho partner · Glendale, CA

California solar software, set up for your utility and your city

A Fresno roof, a Los Angeles roof and a Sacramento roof follow three different paper trails. One Zoho job record keeps them straight.

Our certified Zoho Advanced Partner team works from Glendale, and the tracker we set up follows the offices your jobs really pass through: a building department, then PG&E, SCE, SDG&E, LADWP, SMUD or a city utility, then the PTO letter.

Zoho Advanced PartnerCertified Zoho consultants in California
You’ll talk to our senior team, not a call center.300+ projects · serving US clients since 2025

FresnoPG&E territory

City or county permit, then a Rule 21 interconnection application, then the PTO letter.

Fresno notes →

01The short version

What does California solar software need to track?

Three things per job, in order: the permit from the city or county, the interconnection with whichever utility serves the address, and permission to operate. California makes it hard: one installer can file with dozens of building departments and several utilities in a month. In our setup the address sets both, so coordinators see the next step without a spreadsheet.

Built for
Residential and commercial installers working in one or several California regions
Core apps
Zoho CRM, Zoho Creator, Zoho FSM, Zoho Sign, Zoho Books
Usual scope
Permit and utility tracker, crew regions, contract packet, PTO hand-off

02Heard on discovery calls

Where do California solar jobs lose days?

Mostly between offices, not on the roof. Swipe through six complaints and what changes once each job carries its own permit office and utility.

  • 1 of 6

    “Every city wants something slightly different.”

    Each permit office becomes a record with its own checklist and past correction notes, so new coordinators inherit what the last one learned.

  • 2 of 6

    “Nobody knows which utility a lead is in until the survey.”

    The lead’s address sets the utility and permit office on day one, with a coordinator check for city utilities and county islands.

  • 3 of 6

    “Utility emails live in one person’s inbox.”

    Application IDs, notices and approvals attach to the job; silence past your chosen date raises a task.

  • 4 of 6

    “We drive two hours for a re-inspection we didn’t know about.”

    A failed inspection opens a Zoho FSM return visit with the inspector’s notes, routed to the crew nearby.

  • 5 of 6

    “PTO arrived weeks ago and the customer still hasn’t switched on.”

    Logging the PTO letter sends the switch-on email and raises the final invoice.

  • 6 of 6

    “Batteries doubled our paperwork.”

    Storage jobs carry an extra checklist your team defines, so battery documents never ride on memory.

03North to south

Which California utility region do you install in?

Five regions cover most of the state’s rooftop work, and each one changes the interconnection side of the job. Scroll and the coast rolls south, one region at a time.

Skip to the city notes
  1. Region 1SMUD · Sacramento area

    A public utility with its own rules

    SMUD runs its own interconnection process, so Sacramento jobs get their own document list instead of a copy of the PG&E track.

    Sacramento notes

  2. Region 2PG&E · Bay Area and Central Valley

    One utility, very different jobs

    Steep San Francisco roofs and wide farm sites near Fresno share a utility and the state’s Rule 21 process, so we split them by job type instead.

    San FranciscoSan JoseFresnoBakersfield

  3. Region 3LADWP · City of Los Angeles

    Inside the city line, a different utility

    Los Angeles proper means LADWP; a street away it may be SCE or a city utility such as Glendale’s. The lead checks the address before anyone promises a date.

    Los Angeles notes

  4. Region 4SCE and city utilities · Inland and coastal south

    The widest territory, with local exceptions

    SCE serves much of Southern California, but Riverside, Anaheim, Pasadena and others run their own utilities. Each exception gets its own utility record.

    Riverside notes

  5. Region 5SDG&E · San Diego and south county

    Short drives, busy permit queues

    One utility and a few permit offices, so here the tracker earns its keep by putting the longest-waiting application first.

    San Diego notes

04Eight cities, eight paper trails

Solar software notes for eight California cities

The cities installers ask about most, each with the usual utility, where the permit goes and what we set up first. Utility lines rarely follow city limits, so the real build checks every address.

Sacramento solar software

  • UtilitySMUD across most of the county
  • PermitsCity of Sacramento or the county, by address

Hot summers push Sacramento homeowners toward batteries, and SMUD sets its own interconnection steps. Keeping SMUD as a separate utility record stops a coordinator used to PG&E country from sending the wrong packet. Elk Grove and Folsom keep their own building departments, each with its own checklist.

San Francisco solar software

  • UtilityPG&E wires, often CleanPowerSF for generation
  • PermitsThe city’s building inspection department

Flats, row houses and shared roofs bring access notes, fire setbacks and owner approvals. The Zoho FSM survey asks for roof access and parking, and multi-unit jobs carry every owner’s signature in one Zoho Sign packet.

San Jose solar software

  • UtilityPG&E wires, San José Clean Energy for many homes
  • PermitsCity of San José, plus neighboring Santa Clara County cities

South Bay jobs often bundle panels, a battery and an EV charger, so the main service panel comes up early. A panel-upgrade flag on the survey warns design and permitting. Santa Clara runs its own municipal utility, so the address check matters even inside one metro.

Fresno solar software

  • UtilityPG&E
  • PermitsCity of Fresno or Fresno County

Fresno installers mix homes with farms, packing sheds and well pumps. Farm jobs get their own Zoho CRM pipeline with meter numbers and parcel notes, while homes keep the fast lane. Long drives make region-based crew scheduling in Zoho FSM worth doing early.

Bakersfield solar software

  • UtilityPG&E in the city, SCE in parts of Kern County
  • PermitsCity of Bakersfield or Kern County

In Kern County the utility line splits a sales territory: Bakersfield sits with PG&E while mountain and desert towns to the east fall under SCE. The address sets the utility, so reps quote from the right track. Ground mounts get Zoho Projects phases for trenching and service work.

Los Angeles solar software

  • UtilityLADWP in the city, SCE or a city utility around it
  • PermitsLADBS in the city, other cities and the county elsewhere

Los Angeles is the clearest case for address-first setup. One rep can sell an LADWP roof in the morning, an SCE roof after lunch and a Burbank roof the next day, each on a different utility track. Our own office sits in this patchwork, so the utility lookup comes first.

Riverside solar software

  • UtilityRiverside Public Utilities in the city, SCE across most of the county
  • PermitsCity of Riverside, other Inland Empire cities or the county

The Inland Empire mixes planned communities, warehouses and several utilities in one county, with IID serving parts of the Coachella Valley. HOA approval often sets the install date, so it is its own step with the HOA’s documents. Warehouse roofs get a separate pipeline.

San Diego solar software

  • UtilitySDG&E
  • PermitsCity of San Diego or the county, by address

With one utility across the region, San Diego teams feel the permit side more: city and unincorporated county addresses follow different offices and inspection booking. Coastal jobs can add review steps, kept as optional tasks the coordinator switches on.

06Utility and city picker

What would Zoho track for a job in your city?

Pick a city, check the utility and choose the job type. You get the ordered permit and utility steps we would set up, with the app behind each. It is a sample; your own offices and forms go into the real build.

City
Utility at the address
Kind of job
Permit route

Fresno · PG&E · Home rooftop

Sample

    Drops this job plan into the enquiry form further down the page.

    07Paperwork, not policy

    What can software track for California solar rules, and what stays with you?

    Software tracks the paperwork: dates, documents, application numbers and signatures. It never decides tariffs, incentive eligibility or code questions. Here is how a spreadsheet and a Zoho job record compare on what it can carry.

    Permit status per city or countyStatus, dates and permit number on each job, oldest firstOne tab per office, updated when someone remembers
    Plan check correctionsEach round logged with the reviewer’s notes and the resubmittal dateComments forwarded by email and lost in a thread
    Utility interconnectionApplication ID, utility, notices and approval stored beside the permitA column of IDs and a portal login on a sticky note
    Net billing tariff on the jobThe customer’s tariff stored as a fieldTyped into a notes cell, if at all
    Contract packet and consumer guideSigned packet, signing date and cancel-by date kept with the dealPDFs saved to whichever laptop the rep used
    Battery incentive paperworkYour own checklist, with due dates and filesA second spreadsheet only one person updates
    Deciding what a rule requiresNeither decides. Zoho stores what your advisors asked forNeither decides. Your compliance lead and counsel do

    None of this is legal, tax or engineering guidance. How tariffs, incentives and permit rules apply is your advisors’ call; we turn what they ask for into fields and approvals.

    08Zoho list prices

    What do the Zoho licences cost a California installer?

    For a sample installer with eight office users, three permit coordinators and about 300 field appointments a month, the five core apps come to about $404 a month on yearly billing, paid to Zoho directly.

    Official Zoho US rates on annual plans, before sales tax. Zoho One is the other route: $37 per employee when every employee is covered, or $90 per named user. Our California setup is one fixed figure, agreed in the BRD once each permit office and utility in your territory is listed.

    Licence statement8 office users · yearly billingSample

    App and planUnit priceMonthly
    Zoho CRM Professional × 8$23 / user$184
    Zoho Creator Professional × 3$20 / user$60
    Zoho FSM Standard, 300 appointments$100 / month$100
    Zoho Sign Standard × 2$10 / user$20
    Zoho Books Professional$40 / org$40
    Five core apps$404 / mo

    Zoho FSM tiers include their users, so new installers add no seat fees.

    09Sized by territory

    California solar packages, by how much of the state you cover

    The more utilities and permit offices you file with, the more the tracker has to know. Each package extends into the next without a rebuild.

    1. One utility region

      Home Territory

      • Address-based utility and permit office on every lead
      • Tracker for one utility and your main permit offices
      • Surveys, installs and the PTO hand-off

      Priced once, in writing, for the offices named in your BRD.

    2. Several regions

      Statewide Installer

      • Everything in Home Territory
      • A separate track per utility
      • Crew regions, battery checklist, milestone invoices

      Every utility track is listed in the BRD, and the price beside it holds for the build.

    3. Branches and commercial

      Multi-Branch

      • Everything in Statewide Installer
      • Commercial and ground-mount phases
      • Branch dashboards and stock per warehouse

      Phased, each phase with its own fixed amount, signed off before work on it begins.

    No solar client is named here, and the maps, jobs and lists are samples. Installer systems stay private, so we walk through the patterns on a call instead.

    See our case studies →

    The opening conversation costs you nothing. Installers spread across many branches sometimes need a paid scoping stage before the BRD; you see and approve its price first.

    10Before anything is built

    How a California solar project with us starts

    Four steps, and your coordinators keep their current process until the last one. How we work maps the stages that follow.

    1. Discovery callYour regions, the utilities and permit offices you meet most, and today’s tools.
    2. Office listWe list every permit office and utility from your last few months of jobs, with what each one asks for.
    3. Signed BRDTracker design, crew regions, integrations, our fee and dates per phase, signed before building.
    4. Build, import, trainOpen jobs imported with their status; coordinators trained online, or in person for Southern California teams.
    The full new-project path →

    11California installers ask

    California solar software: common questions

    Utilities, permit offices, batteries, crews and cost. Bring a recent job from a city that gave you trouble.

    Can Zoho track permits for many California cities in one place?

    Yes. Every building department you file with becomes a record in a Zoho Creator tracker with its own checklist. Each job links to its permit office, so coordinators work one queue across all of them, oldest first.

    How does the setup handle PG&E, SCE and SDG&E versus LADWP or SMUD?

    Each utility gets its own record and its own list of steps. The three investor-owned utilities use the state’s Rule 21 interconnection process, while LADWP, SMUD and city utilities run their own. The job picks up the right list from the utility set on the lead, which comes from the address.

    Does Zoho know the net billing tariff rules?

    No. Zoho records which tariff a customer is on and stores the utility documents, but it calculates and decides nothing about the tariff. Those rules come from the utilities and the state.

    Can Zoho track battery incentive paperwork such as SGIP?

    It can track the steps and documents your team files for an incentive program, with due dates and reminders. Whether a project qualifies is decided by the program and your advisors, so we build no eligibility logic.

    Can Zoho stop an install from being scheduled before the contract packet is complete?

    Yes. The job gets a gate: install scheduling stays locked until the signed packet from Zoho Sign is attached and the cancel-by date has passed. Your counsel decides what the packet must contain.

    What do the Zoho licences cost a California installer?

    About $404 a month on yearly billing for the five core apps, in our sample of eight office users, three coordinators and about 300 field appointments a month, at Zoho’s official US prices. Our setup fee is fixed in the BRD.

    12Let’s talk

    Tell us what you’re building. We’ll map the fix.

    Book a 30-minute discovery call with Elite Tech Global. We review your Zoho, AWS, Shopify or WordPress setup, show where AI agents can save time, and agree the next step. If we work together, every requirement and a fixed price go into a signed BRD before the build starts.

    Real people, one team. Led by co-founders Ikramul Karim and Khris Kakosimidi, and a 40+ member team across Zoho, AWS and AI.

    Book a 30-minute discovery call

    Tell us a little and we’ll email you to set up the call.

    What can we help with?

    No spam. We use your details to reply about your project, and send occasional updates only if you tick the box above. See our Privacy Policy.