Skip to content

Industry · Manufacturing · Metal fabrication

Zoho for metal fabrication companies: every beam, cert and pay app on one record

Bids on contractor drawings, mill certs filed by heat number, shop drawings signed off by the GC, pieces tracked by mark from the saw to the jobsite, and progress invoices that match the schedule of values.

Meet Anvil Ridge Fabrication, a fictional structural and sheet metal fabricator in Tulsa, Oklahoma, as it wins the steel package for a warehouse expansion and carries it all the way to the second progress payment.

  • Lynn CarverOwnerDecides which bids are worth chasing and watches retainage.
  • Brett DuncanProject managerOwns the GC relationship, submittals and the delivery plan.
  • Marisol VegaPurchasingBuys the steel and chases every mill test report.
  • Wes HollandShop foremanMoves pieces from the saw line to the paint bay to the truck.

Piece mark

B-14

Sample
Job
25-118
Member
W12x26, 28 ft 4 in
Grade
A992
Ship on
Load 2
  1. 1Cut to lengthBand saw
  2. 2Drill end holesDrill line
  3. 3Fit clips, weldBay 3
  4. 4Shop primePaint bay
  5. 5Load outYard
Heat 4417822

Zoho ProjectsB-14 moves to “On truck” for load 2

01Bid on the drawings

How does a fabricator keep a dozen open bids from blurring together?

Each invitation to bid becomes its own deal in Zoho CRM, with the general contractor, the bid date, the drawing set and addenda attached. Lynn sees every package by close date and tonnage, and Brett writes the inclusions and exclusions once on the deal, so the line about field touch-up paint never goes missing from a proposal again.

Zoho CRMBid · Warehouse expansion, Broken ArrowSample

Drawing set S-1 to S-9, addendum 2. Excludes metal deck.

Structural steel, 86 tons$318,200
Stairs and rails$41,600
Base bid total$359,800

Status: Bid sent to GCAwarded, job 25-118 opened

Sample bid summary on a Zoho CRM deal for a fictional structural steel package.

02Takeoff and mill certs

Where does the mill test report go once the steel is on order?

Onto the takeoff line it belongs to. Marisol loads the material list into a Zoho Creator app we build, groups it by shape and grade, and raises the purchase orders. Every line is flagged until the supplier’s MTR arrives; when it does, she records the heat number and attaches the PDF, so a cert request from the GC takes one search instead of a morning in the filing cabinet.

Zoho CreatorTakeoff · job 25-118Sample
ShapeGradePcsMill cert
W12x26A99214RequestedHeat 4417822
W10x33A9928Heat 4420917
HSS 6x6x3/8A500 C12Heat B71204
PL 3/4 x 12A3640Missing
Sample material takeoff in a Zoho Creator app, with mill cert status and heat numbers per line.

03Shop drawing approval

Can submittals stop bouncing between three inboxes?

Brett sends the shop drawing package from Zoho WorkDrive with a Zoho Sign transmittal, and the review copy stays in one folder that the general contractor can open. When the reviewer returns it marked “approved as noted”, the comments and the signed transmittal sit next to revision 1, and nothing is released to the saw until that status is on the record.

Zoho SignSubmittal 05 12 00-03 · Rev 1Sample

Shop drawings E-101 to E-118, roof framing and lintels, issued for approval. Reviewer to mark each sheet approved, approved as noted, or revise and resubmit.

SubmittedFabricator PM
Under reviewApproved as notedGC reviewer
Sample shop drawing transmittal in Zoho Sign, signed by the fabricator and returned by the contractor's reviewer.

Engineer stamps: if the engineer of record marks up the PDF in their own review software, the stamped file comes back into the same WorkDrive folder. Zoho tracks the status; it does not replace the engineer’s review.

04Cut, weld, coat

Which beam is in the paint bay right now, and which one is still on the saw?

Every piece mark is a task in Zoho Projects, grouped by the load it ships on. Wes’s crew scans the tag at each station with a Creator screen on a rugged phone, and the task moves from cut to welded to coated on its own. Brett can tell the GC that load 2 is three pieces short of ready without walking the yard.

Zoho ProjectsJob 25-118 · Load 2 piecesSample

Cut and drilled 4

B-14, W12x26Heat 4417822At weld bay 3B-15, W12x26Heat 4417822

Welded 3

B-14, W12x26Visual check signedTo paintC-3, HSS 6x6Heat B71204

Coated 9

B-14, W12x26Shop primer, grayReady for load 2B-11, W12x26Ready for load 2
Sample Zoho Projects board where piece mark B-14 moves from cut to welded to coated as its tag is scanned.

Welding records: welder qualifications, procedure specs and any inspection your contract calls for: your compliance lead reviews this. We can store those records and remind you before a qualification lapses; we do not certify welds or welders.

05Delivery and erection

How do truckloads, crane days and the erection crew land on the same calendar?

Loads are milestones in the same Zoho Projects job, so the delivery week shows trucks, the crane booking and the field crew side by side. Columns ship before beams, because that is the order the crew sets them. When the GC moves the crane by a day, Brett drags one milestone and the load list, driver note and crew task move with it.

Zoho ProjectsSite week · job 25-118Sample
MonTueWedThuFri Load 1, columns Crane on site Crew of 4 Load 2, beams Crane on site Rain hold Load 3, stairs Punch walk
Sample delivery and erection week in Zoho Projects with three loads, crane days and a rain hold.

06Progress billing

Can the monthly pay application come from what actually left the yard?

Yes. The schedule of values lives on the job, and percent complete per line comes from the piece marks marked coated or delivered. On the 25th, a Zoho Books invoice is drafted for this period’s work, minus what was billed before and minus retainage. Lynn reviews the draft, sends it, and the retainage still held on every job shows up in one report instead of a sticky note.

Zoho BooksProgress bill 2 · job 25-118Sample

Redbud Builders · pay period 2

DuePaid
LineAmount
Structural steel, 60% complete to date$190,920
Stairs and rails, 0% to date$0
Less billed on progress bill 1−$95,460
Less retainage held, 5% of this period−$4,773
Due this period$90,687
Sample Zoho Books progress invoice built from a schedule of values, with prior billing and retainage subtracted.

Contractor portals: if the GC collects pay applications through its own portal or on its own form, that stays their system. We produce the numbers and a matching PDF from Books; someone in your office still uploads it.

07Trace a heat number

A supplier flags a bad heat. Which beams, which jobs, which trucks?

Pick a heat below. The tree lights up backward to the mill cert, the purchase order and receiving, then forward to every piece mark cut from that steel and the load that carried it to site. Because the heat number was recorded at the takeoff, this is a search, not an afternoon of pulling paper tags.

Traced back

  1. Mill test reportMTR for heat 4417822Chemistry and tensile on file
  2. Purchase orderPO-2231, service center14 pcs W12x26 at 30 ft
  3. ReceivingReceived and taggedCount and heat stencil checked
Heat 441782214 beams bought, 13 cutSample

Went to

  1. Job 25-118, load 2B-11 to B-19Delivered to the Broken Arrow site
  2. Job 25-121, load 1B-2 to B-5Delivered to a church addition, Owasso
  3. Remnant rackOne full-length beamYard bay C, still tagged

Draft notice, generated from the traceSample

To: Redbud Builders, project manager, warehouse expansion. Re: material question on heat 4417822.

Our supplier has asked us to hold material from heat 4417822 while it reviews its test results. Pieces from that heat delivered to your site on load 2:

  • B-11 to B-19, W12x26, roof framing grid lines 4 to 7

We will send the supplier’s findings as soon as we have them. No action is needed until then, other than not field-modifying those members.

Traced back

  1. Mill test reportMTR for heat B71204Filed with the tube order
  2. Purchase orderPO-2236, tube supplier12 pcs HSS 6x6x3/8
  3. ReceivingReceived, one bent tubePhoto and note on the PO
Heat B7120412 tubes, 11 usedSample

Went to

  1. Job 25-118, load 1C-1 to C-11Columns, set on the first crane day
  2. Supplier returnOne tube sent backCredit memo matched in Books

Draft notice, generated from the traceSample

To: Redbud Builders, project manager. Re: column material, heat B71204.

Columns C-1 to C-11 were cut from heat B71204. The mill test report is attached. One tube from this heat was rejected at receiving for a bend and never entered production.

Traced back

  1. Mill test reportNot receivedRequested twice from the supplier
  2. Purchase orderPO-2240, plate supplier40 pcs 3/4 x 12 plate
  3. ReceivingReceived, cert pendingHold tag on the rack
Heat 3390415Base plates, on holdSample

Went to

  1. Nest runNot releasedCreator blocks the cut list until the MTR is filed

Draft reminder to the plate supplierSample

Re: PO-2240, heat 3390415. We received the plate but not the mill test report. The material is on hold and cannot be cut until the report is on file. Please send it to purchasing.

Heat numbers, jobs and companies here are fictional. In a real setup the trace reads the takeoff, receiving and piece-mark records in Creator and Projects; we build the search and the letter templates.

08The Tuesday production meeting

What should a fab shop owner see before the production meeting?

Backlog in tons, bids due, pieces stuck between stations and retainage nobody has chased. Zoho Analytics pulls them from CRM, Projects, Creator and Books, so Lynn walks in with the same numbers as her project managers.

Zoho AnalyticsFab weekSample
  • Awarded backlog412 tonsAcross 9 open jobs
  • Bids due in 14 days72 still waiting on addenda
  • Pieces missing an MTR40All from one plate order
  • Piece marks by station, all jobs
    1. Saw33 pieces
    2. Drill24 pieces
    3. Weld60 pieces
    4. Paint18 pieces
    5. Yard28 pieces
  • Retainage held$61,340$18,200 on jobs already closed out

09Desk by desk

Which Zoho apps does each desk at a fabrication company use?

Six desks, from bidding to collections. Each one shows what lands on it, what it hands on, what Zoho does without any build and what we add.

Bids

Invitations from general contractors, drawing sets that change twice before bid day, and a proposal that has to say exactly what is excluded.

What comes in
Bid invitations, drawing sets, addenda, the GC’s bid form
What goes out
A proposal with inclusions, exclusions and alternates
Built in
Deals by bid date, email tracking, document storage
We build
A standard exclusions library and a hit-rate report by general contractor

Project management

The PM is the link between the GC’s schedule and the shop’s, and spends most days answering “when will it be here?”.

What comes in
Award letter, GC schedule, RFIs, review comments, change requests
What goes out
Submittals, delivery dates, change order pricing
Built in
Milestones, Gantt charts, task lists, signed documents
We build
A job template with your standard submittal and load milestones, plus an RFI and change order log

Material and receiving

The desk that turns a takeoff into steel on the rack and paperwork in the file.

What comes in
The detailer’s bill of materials, supplier quotes, MTRs
What goes out
Purchase orders, receiving records, heat numbers on every line
Built in
POs and bills in Books, stock counts for remnants and consumables in Inventory
We build
The takeoff import, the cert-missing hold and the heat number search

Fab floor

Saw, drill line, fit and weld bays, paint. The crew wants a scan, not a form.

What comes in
Released shop drawings, cut lists, piece-mark tags
What goes out
Station scans, weld visual checks, coated and ready counts
Built in
Creator’s mobile app with barcode scanning, Projects task status
We build
Tag printing, one scan screen per station and the update that moves the Projects task

Field and erection

Trucks, cranes and a crew that has to know the load order before the first piece is lifted.

What comes in
Load lists, erection drawings, crane bookings, site contacts
What goes out
Signed delivery tickets, punch items, field photos
Built in
Mobile apps, file sharing, chat channels per job
We build
A delivery ticket the driver gets signed on a phone and a punch list tied to piece marks

Billing and retainage

Monthly progress bills, change orders and the retainage that sits unpaid long after the last beam is set.

What comes in
Schedule of values, percent complete, approved change orders, lien waiver requests
What goes out
Progress invoices, statements, a retainage aging list
Built in
Invoices, payment recording, bank feeds, sales tax
We build
The schedule of values on each job, the draft progress bill and the retainage report

11Job by job

What changes for a fabricator, one job at a time?

Plenty of fab shops run on a bid spreadsheet, a shared drive, paint-pen marks on the steel and an accounting package. Pick a job to see both answers side by side, including the one where the old way is fine.

Answering a GC’s cert request

Zoho, set up for fabrication

Search the piece mark, open the heat, download the MTR. The PM does it from the jobsite.

Spreadsheets, shared drive and paint pen

Find the PO, find the supplier’s packing list, hope the cert was scanned with it.

Knowing what is approved for fabrication

Zoho, set up for fabrication

Each sheet carries its review status, and the cut list only releases approved sheets.

Spreadsheets, shared drive and paint pen

A folder called “approved” and a PM who remembers which revision went out last.

Telling the GC when load 2 ships

Zoho, set up for fabrication

The board shows how many marks on the load are coated and how many are still at the weld bay.

Spreadsheets, shared drive and paint pen

Call the foreman, who walks the yard and counts.

Building the monthly progress bill

Zoho, set up for fabrication

A draft from the schedule of values and finished marks, with prior billing and retainage already subtracted.

Spreadsheets, shared drive and paint pen

Last month’s pay app copied, percentages guessed, math checked twice.

Nesting plate and running the beam line

Zoho, set up for fabrication

Not its job. Nesting and CNC software keep doing it.

Spreadsheets, shared drive and paint pen

Not their job either. Same software, same machines.

A two-person shop doing handrail and gates

Zoho, set up for fabrication

Probably more than you need yet. Zoho Books on its own may be the right first step.

Spreadsheets, shared drive and paint pen

Cheap, quick and fine while the owner still touches every job personally.

12What we do

What does Elite Tech Global set up for a metal fabricator, and what do we leave alone?

The split matters more in fabrication than in most trades, because the machines and the model already have good software. We build the paper trail around them, from the bid to the last retainage check.

Left where it works

  • The 3D model, connection design and shop drawing production in your detailing tool
  • Plate nesting, beam line and plasma programs at the machine
  • Takeoff and bid pricing in a dedicated estimating tool, if your estimator lives in one
  • The engineer’s review and stamp on the shop drawings
  • Your welding procedures and qualifications, as your compliance lead defines them
  • The GC’s portal for pay applications and lien waivers

Built by us in Zoho

  • Bid pipeline in CRM with an exclusions library and hit rate by GC
  • A Creator takeoff app with heat numbers, MTR holds and the trace search
  • Submittal folders in WorkDrive with Sign transmittals per revision
  • Piece-mark tags, station scans and a Projects board per load
  • Books with job-tagged POs, schedule of values and progress billing
  • Training for the PMs, purchasing and the floor, then a review after the first job ships

Cutting small runs of machined parts rather than structural packages? Zoho for CNC job shops walks through routing-based quotes and travelers instead.

13Licenses and our fee

What does Zoho cost for a 45-person steel fabricator?

It depends mostly on whether the floor crew scans tags. If they do, nearly everyone needs a login and Zoho One is the easy count. If only the office, PMs and purchasing use software, single apps can come in well under it.

Zoho One, All Employee

$37 per employee / month, billed yearly

The rate Zoho shows applies to your first year. Everyone on payroll is covered, welders and drivers included.

Zoho One, Flexible User

$90 per user / month, billed yearly

You license named people only. Suits a shop where the crew keeps paper tags and the office does the scanning.

Our work

Fixed fee in a signed BRD

The opening discovery call is on us, with no charge. If a detailing export or an accounting move needs looking at first, that scoping can be a paid step; the build itself is priced once in the BRD. Ongoing help is from $300/month for one Zoho product, see hiring a Zoho expert.

Anvil Ridge Fabrication, 45 people Sample, illustrative

OptionWho is licensedPer month
Zoho One, All Employee45 employees at $37$1,665
Zoho One, Flexible User12 office, PM and purchasing users at $90$1,080

Single apps for the office only Sample, illustrative

App and planLicensedPer month
Zoho Creator Professional6 users at $20$120
Zoho Projects Premium15 users at $4$60
Zoho CRM Professional3 users at $23$69
Zoho Books ProfessionalPer organization$40
Zoho Sign Standard2 users at $10$20
TotalBilled yearly$309

US list prices, billed yearly, before sales tax. File storage in WorkDrive is extra on the single-app path. Anvil Ridge is made up; on the call we count your real logins, crew scanners included, before anyone recommends a plan.

14How we start

How does a fab shop move to Zoho without losing track of the jobs already on the floor?

New jobs start on Zoho; jobs already in fabrication finish the old way. We list where the work begins below, and the later phases are on how we work.

  1. 1

    A 30-minute look at one package

    Bring a recent bid, a takeoff and a pay app. We point out where the same piece mark or heat number gets typed again.

  2. 2

    Follow one beam

    With the PM, purchasing and the foreman, one piece is followed from takeoff to the truck, marking what the detailing and nesting tools already handle.

  3. 3

    Written scope, fixed price

    Apps, the BOM import, tag layout, the Books setup and the progress bill format go into a BRD with one price, signed before setup begins.

  4. 4

    A dry run on a made-up job

    A fictional steel package runs from bid to a paid progress bill, so each desk tries its own screens before the next real award goes in.

15Questions fabricators ask

Zoho for metal fabrication companies: FAQ

Mill certs, submittals, piece marks, progress billing, nesting software and cost. If yours is not here, bring it to the call.

Can Zoho keep mill test reports and heat numbers for every piece?

Yes, with a Creator app we build. Each takeoff line records the heat number from the supplier's mill test report and holds the PDF, and each piece mark cut from that steel inherits the heat. A cert request from the general contractor, or a supplier asking about one heat, becomes a search instead of a trip through paper files.

How are shop drawing submittals and approvals handled?

Submittal packages live in a WorkDrive folder per job and revision, and the transmittal goes out through Zoho Sign. The reviewer's status, approved, approved as noted, or revise and resubmit, is recorded on the job, and the cut list releases only approved sheets. The engineer's stamp and review stay with the engineer.

Can we track pieces by piece mark through the shop?

Yes. Each piece mark is a task in Zoho Projects grouped by the load it ships on, and the crew scans a printed tag at the saw, weld bay and paint bay with the Creator mobile app. The PM sees which marks are ready for a load without walking the yard.

Does Zoho Books handle progress billing and retainage?

Books issues the invoices, records payments and reports on what is owed. We add the schedule of values on each job and a draft progress bill that takes percent complete from finished piece marks, subtracts prior billing and holds retainage as a tracked amount. If a GC wants a specific pay application form, we produce it as a template from the same numbers.

Do we have to give up our detailing, nesting or estimating software?

No. The model, shop drawings, nests and machine programs stay in the tools built for them, and a dedicated estimating tool can stay too. Zoho takes in the exported bill of materials, the bid results and the cut records, and handles purchasing, tracking, approvals and billing around them.

Can Zoho hold welder qualifications and welding procedure records?

It can store them, link them to welders and send reminders before a qualification lapses. What those records must contain, and any certification program you follow, is for your compliance lead to define. We configure Zoho to that list and make no certification claim for it.

How do change orders from the general contractor get tracked?

Each change request is logged on the job in Zoho Projects with the drawings it touches, priced, and sent for signature through Zoho Sign. Once approved, it is added as a new line on the schedule of values, so the next progress bill picks it up without anyone retyping it.

How much does Zoho cost for a 45-person fabrication shop?

Zoho One All Employee is $37 per employee a month billed yearly, a rate Zoho applies to the first year, which is $1,665 a month for 45 people. If only the office and PMs log in, Creator, Projects, CRM, Books and Sign bought separately can cost far less. We price the fabrication setup once, in a signed BRD; the first conversation with us is the only free part.

16Let’s talk

Tell us what you’re building. We’ll map the fix.

Book a 30-minute discovery call with Elite Tech Global. We review your Zoho, AWS, Shopify or WordPress setup, show where AI agents can save time, and agree the next step. If we work together, every requirement and a fixed price go into a signed BRD before the build starts.

Real people, one team. Led by co-founders Ikramul Karim and Khris Kakosimidi, and a 40+ member team across Zoho, AWS and AI.

Book a 30-minute discovery call

Tell us a little and we’ll email you to set up the call.

What can we help with?

No spam. We use your details to reply about your project, and send occasional updates only if you tick the box above. See our Privacy Policy.